In May 2022, mobilized skilled team to attend belowjobs and completed on time to depart vessel. Passage way ventilation blower renewal with repair Cargo hold blower renewal with impeller balancing. Heating coil renewal at Bilgewatertank. Greywatersewage line pipe installationwithvalverenewal. Fabrication and installation at anchorage.
Vessel: LUCK SEA Various Steel Work and Mechanical Work at Anchorage
Ventilation louver fabrication and installation, gangway repair and support renewal, Winch repair with brake band renewal, gangway support beam fabrication and installation at anchorage.
Vessel SFERA-Collison Damage – Steel Repair
In March 2022, we mobilised repair team to outer port limit anchorage to carry out collision damage repairs onboard vessel while she was fully loaded.